1A-35 Engine General Information and Diagnosis:
1
6) Disconnect the ECM coupler. Refer to “ECM Removal
and Installation in Section 1C (Page 1C-1)”.
7) Insert the needle pointed probes to the lead wire coupler.
8) Check the continuity between the R wires “A” (#1 and
#2) and terminal “11”.
Also, check the continuity between the Bl/R wire “B” and
terminal “26” (#2), or G/B wire “B” and terminal “9” (#1).
Special tool
(A): 09900–25008 (Multi-circuit tester set)
(B): 09900–25009 (Needle pointed probe set)
Tester knob indication
Continuity (
)
ECM coupler (Harness side)
Is the continuity OK?
Go to Step 2.
• R and Bl/R or G/B
wire open.
• Bl/R or G/B wire
shorted to ground.
Step
Action
Yes
No
“B”
“A”
(A)
(B)
“9”
“11”
“26”
(Black)
(Gray)
I822H1110021-02
Содержание VLR1800
Страница 4: ......
Страница 64: ...0C 12 Service Data...
Страница 456: ...2D 22 Wheels and Tires...
Страница 489: ...Drive Chain Drive Train Drive Shaft 3A 31 09951 17010 Bearing installer Page 3A 19...
Страница 490: ...3A 32 Drive Chain Drive Train Drive Shaft...
Страница 580: ...6B 11 Steering Handlebar...
Страница 623: ...Prepared by January 2008 Part No 99500 39360 01E Printed in Japan 624...