40
Sun Fire V445 Server Installation Guide • November 2006
Caution –
Never move the server when the server power is on. Movement can
cause catastrophic hard drive failure. Always power off the server and allow several
seconds for the drives to spin down before moving it.
Caution –
The AC power cords provide a discharge path for static electricity.
Unless otherwise noted in the
Sun Fire V445 Server Service Manual,
the cords must
remain plugged in to the AC outlets when you install or handle internal
components.
Powering On Using the Power Button
1. Ensure that your system console device is turned on and active.
2. Turn on power to any peripherals and external storage devices.
Read the documentation supplied with the device for specific instructions.
3. If you have not already done so, connect the Sun Fire V445 server’s outlet plug of
each power cord to the power sequencer in the cabinet (if your type of cabinet
includes one), to a grounded outlet strip, or to a grounded AC power outlet.
Caution –
High leakage current. To prevent leakage current in excess of 3.5 mA, a
maximum of two power cords can be connected to a single branch circuit. The
remaining two power cords must be connected to a different branch circuit.