Returning the Server to Operation
179
Note –
As soon as the power cords are connected, standby power is applied.
Depending on how the firmware is configured, the system might boot at this time.
Related Information
■
“Power On the Server Using the
poweron
Command” on page 179
■
“Power On the Server Using the Front Panel Power Button” on page 180
▼
Power On the Server Using the
poweron
Command
Note –
If you are powering on the server following an emergency shutdown that
was triggered by the top cover interlock switch, you must use the
poweron
command.
●
Type
poweron
at the service processor prompt.
You will see an
->
Alert message on the system console. This message indicates
that the system is reset. You will also see a message indicating that the VCORE has
been margined up to the value specified in the default
.scr
file that was
previously configured. For example:
Related Information
■
“Power On the Server Using the Front Panel Power Button” on page 180
->
poweron
->
start /SYS
Содержание SPARC T5120
Страница 4: ......
Страница 34: ...18 Sun SPARC Enterprise T5120 and T5220 Servers Service Manual July 2009 FIGURE Diagnostics Flowchart...
Страница 72: ...56 Sun SPARC Enterprise T5120 and T5220 Servers Service Manual July 2009...
Страница 171: ...Servicing Boards and Components 155 FIGURE Installing a Hard Drive Backplane in a Sun SPARC Enterprise T5120 Server...
Страница 190: ...174 Sun SPARC Enterprise T5120 and T5220 Servers Service Manual July 2009...
Страница 224: ...208 Sun SPARC Enterprise T5120 and T5220 Servers Service Manual July 2009...