59
Notes on System Operation
Notes on System Operation
Starting Each Device
Use the following procedure when starting system operation.
a
Turn on the network switch, and wait until the network switch is up and running
The network switch has finished booting when the [MST] status LED is lit solid green.
b
Turn on the NSM server, and log in to Network System Manager
c
Turn on the IP converters. There are no restrictions on the starting order
.
d
Turn on the other target devices for operation.
e
Check that the number of notifications is zero on the GUI screen of Network System Manager.
f
Check the following items on the routing screen of Network System Manager.
•
Background color of source device icons is light gray.
•
All name tabs are blue.
g
Check the following items on the routing screen of Network System Manager.
•
Background color of destination device icons is light gray.
•
Name tabs are blue or light gray.
If there are devices not connected to the network switch, their icons have a light gray background and light gray name
tabs on the routing screen of Network System Manager.
5
6
7
Tip