80
e) To fit the side frames, insert the six side frames (6) into the grooves in the frame
of the side frames (7).
Figure 38 - Assembly of the casings Hidro 17 and Hidro 23
Important note:
if you have Douro 17 and Douro 23 covers in stock, you may
apply the side covers to the Hidro 17 and Hidro 23 machines. However, the upper front
cover, part A in Figure 38, must be ordered separately in the corresponding colour.
f) To finish, you must place the upper grid on the appliance (8).
Figure 39 - Assembly of the casings Hidro 17 and Hidro 23
6
7
8
A
Содержание Hidro 12
Страница 18: ...12 Figure 11 specifies the basic requirements for installing the chimney to the unit a b ...
Страница 102: ...96 ...
Страница 103: ...97 ...
Страница 104: ...98 ...
Страница 133: ...127 25 2 Flow chart Hidro 12 Flow chart 1 Lighting ...
Страница 134: ...128 ...
Страница 135: ...129 Flow chart 2 Disabling Note The circulator pump off below 40 C water temperature ...
Страница 136: ...130 25 3 Flow chart Hidro 17 and Hidro 23 Flow chart 1 Lighting ...
Страница 137: ...131 ...
Страница 138: ...132 Flow chart 2 Disabling Note The circulator pump off below 40 C water temperature ...