....................................................................................
...........................................................................
.............................................................................
..........................................................................
.......................................................................................
....................................................................................
...................................................................................
................................................................
...........................................................................
........................................................................
...........................................................................
.........................................................................
..............................................................................
.........................................................................................
.........................................................................................
................................................................................
.......................................................................................
...........................................................................................
Alarm / Failure / Recommendation List – Columbus Control
...................................................................................
...................................................................................................
...............................................................................
Instruction for installing the casings
..........................................................
14.1. Installation of the casings Hidro 12
.........................................................
14.2. Installation of the casings Hidro 17 and Hidro 23
.....................................
Casings Fuji Oak, Himalaia and K2
................................................
............................................................................
................................................................................
14.4. Filling the pellet reservoir
......................................................................
Installation and operation with the remote control (chrono-thermostat) – not
included in free standing units
.........................................................................
15.1. Instructions for remote control assembly
................................................
...........................................................................................
................................................................................
.............................................................................
...............................................................................
Содержание Hidro 12
Страница 18: ...12 Figure 11 specifies the basic requirements for installing the chimney to the unit a b ...
Страница 102: ...96 ...
Страница 103: ...97 ...
Страница 104: ...98 ...
Страница 133: ...127 25 2 Flow chart Hidro 12 Flow chart 1 Lighting ...
Страница 134: ...128 ...
Страница 135: ...129 Flow chart 2 Disabling Note The circulator pump off below 40 C water temperature ...
Страница 136: ...130 25 3 Flow chart Hidro 17 and Hidro 23 Flow chart 1 Lighting ...
Страница 137: ...131 ...
Страница 138: ...132 Flow chart 2 Disabling Note The circulator pump off below 40 C water temperature ...