225
Powercom
Example - Communication address 3:
On
Off
DIP switch
Example - Communication address 4:
On
Off
DIP switch
Example - Communication address 5:
On
Off
DIP switch
You will find more information at:
http://en.wikipedia.org/wiki/Binary_number.
Installing the RS485 interface
Procedure
►
Install the RS485 interface in the inverter in accordance with the interface card installation instructions.
Connect inverters to the Solar-Log™
The wiring is done using a
•
ready-made BKL2 data cable (optional extra; not supplied)
or
•
self-made, shielded 4 wire data cable and terminal block connector.
Procedure
1. Open the inverter as shown in the inverter's instructions.
2. Pull the free wires through the wire opening in the inverter.
3. If you are making the cable yourself, connect the wires as shown in the following diagram:
Содержание Solar-Log
Страница 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Страница 20: ...20 01 Inverter ...
Страница 366: ...366 Surpass SSE Note Feed in management Power reductions of less than 10 are set by the inverters to 10 ...
Страница 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Страница 402: ...402 02 Meter ...
Страница 444: ...444 03 Battery Systems ...
Страница 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Страница 463: ...463 04 Heating rods ...
Страница 470: ...470 05 Heating pumps ...
Страница 478: ...478 06 Sensors ...
Страница 488: ...488 07 Pyranometer ...
Страница 495: ...495 08 Smart Plug components ...
Страница 502: ...502 09 Power Charging Stations ...