GTBZ26&28J Maintenance Manual
19
Table 2-3 Inspection and Preventive Maintenance Schedule
Area
Time Interval
Prior-startup
1
inspection
Weekly
preventive
maintenance
Monthly
preventive
maintenance
Pre-delivery
2
inspection
or daily
3
inspection
Annual
4
(yearly)
inspection
Every
2
years
Main boom assembly
9
Main boom weldment
1,2,4
1,2,4
Hose/sling
bracket
device
1,2,9,12
1,2,9,12
Stop pin and pin roll
limit
1,2
1,2
Pulley and pulley axis
pin
1,2
1,2
Bearing
1,2
1,2
Wear pad
1,2
1,2
Outer
cover
or
protective plate
1,2
1,2
Telescopic
power
chain system
1,2,3
1,2,3
Platform assembly
9
Platform
1,2
1,2
Handrail
1,2
1
1,2
Door
5
1
1,5
Floor
1,2
1
1,2
Rotary device
9,5
15
Safety belt anchoring
point
2
1,2,10
1,2,10
Turntable assembly
9
Rotary support
1,2,14
1,2,3,13
,14
Oil pump coupling
9
Rotary system
11
11
Turntable lock pin
1,2,5
1,2,5
Covering parts &
locks
5
1,2,5
Underframe assembly
9
Tire
1
16,17
16,17,18
16,17,18
Tire nut/bolt
1
15
15
15
Wheel bearing
14,24
Floating system
5,8
outrigger
telescopic
system
5,8
5,8
Rotary part
Drive motor
Drive hub
11
11
Function/control
9
Platform control
5
5
6
6
Содержание GTBZ26
Страница 29: ...GTBZ26 28J Maintenance Manual 26 Figure 3 3 Reducer Breakdown Drawing...
Страница 50: ...47...
Страница 55: ...52...