GTBZ26&28J Service Manual
14
Table 2-1 Inspection and Maintenance
Type
Frequency
Primary
Responsibility
Maintenance
Qualification
Reference
Pre-operatio
n inspection
Before daily use, or when the
operator is changed.
User or operator
User or operator
Operation manual
Pre-delivery
inspection
Before each sale, rent or lease.
Owner, agent or user
Equipment engineer
approved by
SINOBOOM
Service manual and
applicable
SINOBOOM
inspection form
Daily
inspection
Used for 3 months or 150 hours
(whichever comes first);
Or idle for more than 3 months;
Or the purchased equipment is
old.
Owner, agent or user
Equipment engineer
approved by
SINOBOOM
Service manual and
applicable
SINOBOOM
inspection form
Equipment
annual
inspection
Annual overhaul shall not be
more than 13 months compared
with the last inspection.
Owner, agent or user
Qualified
maintenance
technician
(recommended)
Service manual and
applicable
SINOBOOM
inspection form
Preventive
maintenance
Carried out according to the time
interval specified in the service
manual.
Owner, agent or user
Equipment engineer
approved by
SINOBOOM
Service manual
2.2 Maintenance and Guide
Overview
The following information assists you in using
and applying repair and maintenance
procedures contained in the instruction.
Safety and Operation Standard
Safety of yourself and others shall be the first
consideration during equipment maintenance.
Be sure to always pay attention to weight. Do
not move heavy parts without assistance of
mechanical equipment. Weight cannot be put
at any unstable position. Adequate support
shall be ensured when a part of the equipment
is lifted.
Cleaning
1. The most important thing to prolong
service life of the machine is to prevent
entry of dirt or impurities into the
machine. The machine has taken
preventive measures to prevent such
invasion. Protective plate, outer cover,
sealing and filter are used to keep supply
of air, fuel and engine oil clean. They
shall be timely maintained as required to
ensure the effects of protective measures.
2. When any air, fuel or engine oil pipeline
is connected, clear the neighboring area,
openings and joints. Once a pipeline or a
part ruptures, all openings shall be
covered at once to prevent entry of
foreign matters.
3. During repair or maintenance, check and
clean all the parts to ensure all passages
and openings are free of blockage. All
parts shall be covered to make sure they
are clean. All parts must be kept clean
before installation. New parts shall be
stored in containers before use.
Содержание GTBZ26
Страница 29: ...GTBZ26 28J Maintenance Manual 26 Figure 3 3 Reducer Breakdown Drawing...
Страница 50: ...47...
Страница 55: ...52...