Installation without a crane
• Remove the terminal cover
⑧
that is plugged in on the top and mount it after the 3RW55 soft
starter has been mounted completely (Page 76).
• Screw the lower 2 screws into the mounting plate
①
.
• Ensure that both screws protrude at least 4 cm and then place the 3RW55 soft starter onto
the 2 lower screws
②
from above using the handles
⑤
provided (2 people).
• Tilt the 3RW55 soft starter up so that it is resting level against the mounting plate
③
and
tighten all 4 screws with the specified torque
④
.
Installation with a crane
• Remove the terminal cover
⑧
that is plugged in on the top and mount it after the 3RW55 soft
starter has been mounted completely (Page 76).
• Screw the lower 2 screws into the mounting plate
①
. Make sure that both screws are
protruding at least 4 cm.
• Use a crane load attachment with 4 hooks to lift the 3RW55 soft starter out of the packaging.
Attach the hooks of the crane load attachment to the cutouts
⑥
and
⑦
. Lift the 3RW55 soft
starter horizontally out of the packaging and set the 3RW55 soft starter down on a horizontal
surface.
• Use a crane load attachment with 2 hooks to mount the 3RW55 soft starter. Attach the hooks
of the crane load attachment to the cutouts
⑥
.
Mounting and dismantling
4.3 Mount the 3RW55 and 3RW55 Failsafe soft starters on a level surface
SIRIUS 3RW55 and 3RW55 Failsafe Soft Starters
Equipment Manual, 02/2022, A5E35630887002A/RS-AF/006
59