08/2008
3 Setting up functions
3.3 Fault services
© Siemens AG 2008 All Rights Reserved
ePS Network Services, Function Manual (FH) - Release 08/2008
3-115
Interval Content
Type
monthly
Enter a cycle 'n' in
- Months.
Either by selecting the
- first,
- second,
- third
or
- fourth
day of the week from Monday to
Sunday in the month
or
select the day of the month from 1 to
31 (then without day of the week).
DISPLAY
INPUT
SELECTION
(1 to 99,999 min-
utes or hours)
Last execution
Undefined
This is selected if no restriction is set
for the last execution.
If you deselect undefined, you need
to select a date for the last execution.
DISPLAY
SELECTION
(Toggle)
Last execution
on
You can only make an entry if unde-
fined is deselected for the last execu-
tion.
You can only specify a date for the
last execution via the calendar selec-
tion function (see above – calendar
field).
DISPLAY
SELECTION
Each trigger can be assigned a label, which determines its behavior at the central
starting date for maintenance (see also: Sub-section 6.1.3 "Machines"
Æ
Master
data, and general description of triggers):
•
If a label has been set and a starting date, which has not yet been reached,
has been configured in the overview of the control monitors, the trigger will not
be initiated.
•
If the date has been reached or is in the past, the interval starts and a trigger
is initiated at the end of the interval.
•
If a starting date has not been configured, or the label has not been set, the
trigger will be initiated at the end of the interval according to the conditions set
for it.
Notice
The starting time and starting date are not the time of the first trigger, but the start
of the interval at the end of which the trigger takes place.