Installation
4.2 Electrical Installation
Converter with control units CU250D-2
46
Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
Figure 4-13 PM250D connectors
Cable, connectors and tools specifications
The detailed specifications for the cables, connectors and tools required to manufacture the
necessary cables for the SINAMICS G120D are listed in the following tables. The
connections that are detailed in this section relate to the physical connections that exist on
the Inverter. Information for the preparation and construction of the individual connectors
have separate detailed instructions delivered with the ordered parts, direct from the
manufacturers. Use 75 °C copper wire only.
Note
NFPA compatibility
These devices are intended only for installation on industrial machines in accordance with
the "Electrical Standard for Industrial Machinery" (NFPA79). Due to the nature of these
devices they may not be suitable for installation accordance with the "National Electrical
Code" (NFPA70).
Table 4- 9
Tools
Order number
Crimp tool (Q8/0 and Q4/2)
3RK1902-0AH00
Removal tool (Q8/0)
3RK1902-0AJ00
Removal tool (Q4/2)
Harting part number 0999-000-0305
No special tools are required for the Control Unit connectors