6.3
Managing projects
6.3.1
SIMOTION SCOUT project
The project is the highest level in the data management hierarchy. SIMOTION SCOUT saves
all data which belongs, for example, to a production machine, in the project directory. The
project is therefore the sum of all data, programs, settings, etc.
The project encompasses all of the SIMOTION devices, drives, etc., that belong to a machine.
The axes, external encoders, path objects, cams, technology, and programs are assigned
hierarchically to the respective devices. This hierarchical structure is displayed in the project
navigator.
Configuring/parameterizing
6.3 Managing projects
SIMOTION SCOUT
66
Configuration Manual, 11/2016
Содержание SIMOTION SCOUT
Страница 12: ...Preface 1 4 Hotline and Internet addresses SIMOTION SCOUT 12 Configuration Manual 11 2016 ...
Страница 32: ...Installation 4 4 Licenses SIMOTION SCOUT 32 Configuration Manual 11 2016 ...
Страница 64: ...User interface 5 11 Adding add ons to the workbench SIMOTION SCOUT 64 Configuration Manual 11 2016 ...
Страница 146: ...Configuring parameterizing 6 14 Writing the boot sector SIMOTION SCOUT 146 Configuration Manual 11 2016 ...
Страница 224: ...Product combinations 13 9 DCC programming system SIMOTION SCOUT 224 Configuration Manual 11 2016 ...
Страница 244: ...Index SIMOTION SCOUT 244 Configuration Manual 11 2016 ...