Installation on a standard rail, 50
Rack, 51
Installation on a standard rail, 50
K
Keyhole hang-up mechanism
Installation, 51
Overview, 24, 25, 26, 27
L
Display, 28
Overview, 24, 25, 26, 27, 28
M
M12 data plug-in connector, 19
M12 Power T-Tap, 22, 60
MDI / MDI-X autocrossover, 58
MTBF, 76, 78, 80, 82
P
Permitted ambient conditions, 75, 77, 79, 81
PLUG, 37
PoE, 25, 27, 41
Power over Ethernet, 41
Power supply
Connecting up, 59, 62
Overview, 24, 25, 26, 27
Power supply unit, 21
Power T tap, 22, 60
Protective cap, 23
Protective caps, 19
R
Rack, 51
Reset device, 33, 72
Reset to Factory Defaults, 34, 72
S
for installation, 45
general, 9
Use in hazardous areas, 9, 45, 53
when connecting up, 53
SELECT/SET button, 30, 71
Serial interface
Connecting up, 66
Cover, 24, 25, 26, 27, 66
Overview, 24, 25, 26, 27
Signaling contact, 29
Connecting up, 64
Overview, 24, 25, 26, 27
SIMATIC NET glossary, 6
SIMATIC NET manual, 6
Spare parts, 23
Startup phase, 29, 34, 72
System manual, 6, 47, 94
W
Web Based Management (WBM), 38, 71
Weight, 75, 77, 79, 81
Index
SCALANCE XP-200
96
Operating Instructions, 03/2021, C79000-G8976-C428-08
Содержание SCALANCE XP208EEC
Страница 10: ...Safety notices SCALANCE XP 200 10 Operating Instructions 03 2021 C79000 G8976 C428 08 ...
Страница 16: ...Recommendations on network security SCALANCE XP 200 16 Operating Instructions 03 2021 C79000 G8976 C428 08 ...
Страница 52: ...Installation 5 5 Rack mounting SCALANCE XP 200 52 Operating Instructions 03 2021 C79000 G8976 C428 08 ...
Страница 70: ...Connecting up 6 7 Functional ground SCALANCE XP 200 70 Operating Instructions 03 2021 C79000 G8976 C428 08 ...
Страница 88: ...Dimension drawings SCALANCE XP 200 88 Operating Instructions 03 2021 C79000 G8976 C428 08 ...