Connecting up functional ground
1
2
①
Grounding terminal with cable
②
Screw (M4 thread) with spring washer and washer
Follow the steps below to connect the functional ground:
1. Put the grounding terminal
①
, and the bolt
②
together as shown in the drawing.
2. Screw in the bolt
②
with a maximum tightening torque of 1.5 Nm.
Connecting up
6.7 Functional ground
SCALANCE XP-200
Operating Instructions, 03/2021, C79000-G8976-C428-08
69
Содержание SCALANCE XP208EEC
Страница 10: ...Safety notices SCALANCE XP 200 10 Operating Instructions 03 2021 C79000 G8976 C428 08 ...
Страница 16: ...Recommendations on network security SCALANCE XP 200 16 Operating Instructions 03 2021 C79000 G8976 C428 08 ...
Страница 52: ...Installation 5 5 Rack mounting SCALANCE XP 200 52 Operating Instructions 03 2021 C79000 G8976 C428 08 ...
Страница 70: ...Connecting up 6 7 Functional ground SCALANCE XP 200 70 Operating Instructions 03 2021 C79000 G8976 C428 08 ...
Страница 88: ...Dimension drawings SCALANCE XP 200 88 Operating Instructions 03 2021 C79000 G8976 C428 08 ...