5/184
Siemens Building Technologies
Basic Dokumentation RVA63.280, RVA53.280
CE1P2374E
Landis & Staefa Division
Summary
19.04.2001
2.21
Minimum limitation of boiler temperature (TKmin)......................................... 81
2.22
Extra heating for the bathroom...................................................................... 82
2.22.1
Extra heating for the bathroom...................................................................... 82
Heating circuit................................................................................................................ 83
2.23
Parallel displacement of heating curve.......................................................... 83
2.24
Room influence ............................................................................................. 84
2.25
Switching differential of room temperature (SDR) ......................................... 85
2.26
Operating mode of room unit......................................................................... 86
2.27
Room unit values........................................................................................... 87
2.27.1
Examples of room unit assignments ............................................................. 88
2.28
Minimum limitation of flow temperature setpoint (TVmin).............................. 89
2.29
Maximum limitation of flow temperature setpoint (TVmax)............................ 90
2.30
Maximum forward shift of optimum start control............................................ 91
2.30.1
Optimum start control .................................................................................... 91
2.30.2
Without room influence.................................................................................. 92
2.30.3
With room influence....................................................................................... 92
2.31
Maximum forward shift of optimum stop control ............................................ 93
2.31.1
Optimum stop control .................................................................................... 93
2.32
Type of building construction......................................................................... 94
2.33
Adaption of heating curve.............................................................................. 95
2.33.1
Adaption ........................................................................................................ 95
2.34
Locking signal gain........................................................................................ 97
2.35
Floor curing ................................................................................................... 98
2.35.1
Temperature profile ....................................................................................... 98
2.35.2
Activating the function ................................................................................... 99
2.35.3
Function......................................................................................................... 99
2.35.4
Display........................................................................................................... 99
2.35.5
Aborting the function ..................................................................................... 99
D.h.w.
100
2.36
Reduced setpoint of d.h.w. temperature (TBWR) ....................................... 100
2.37
D.h.w. heating program ............................................................................... 101
2.37.1
24-hour operation setting 0 ........................................................................ 101
2.37.2
Operation according to the time switch programs with forward shift (d.h.w.)
Setting 1 ...................................................................................................... 102
2.37.3
Operation according to the local time switch program 3 (d.h.w.) Setting 2 . 102
2.38
Assignment of d.h.w. heating ...................................................................... 103
2.39
D.h.w. charging ........................................................................................... 104
2.39.1
Once per day with a forward shift of 2.5 hours Setting 0............................. 104
2.39.2
Several times per day with a forward shift of 1 hour Setting 1 .................... 104
2.40
Type of d.h.w. demand ................................................................................ 105
2.41
Boost of flow temperature setpoint for d.h.w. heating (UEBW) ................... 107
2.42
D.h.w. priority............................................................................................... 108
2.42.1
Frost protection for the plant ....................................................................... 108
2.42.2
Shifting priority............................................................................................. 109
2.42.3
Temperature-time integral ........................................................................... 110
2.43
Controlling element for d.h.w....................................................................... 111
LPB / system ............................................................................................................... 112
2.44
LPB device address .................................................................................... 112
2.45
LPB segment address ................................................................................. 113
2.46
LPB power supply ....................................................................................... 114
2.47
Display of LPB power supply....................................................................... 115
2.48
Range of action of central changeover........................................................ 116
2.49
Automatic summer / winter changeover ...................................................... 117
2.50
Central stand-by switch ............................................................................... 118