Central control unit RMB795B
CE1P3122en
Building Technologies
Commissioning
18.01.2012
5 Commissioning
5.1
Before you start
5.1.1
Safety notes
Preparation for use and commissioning of Synco™ 700 products must be
undertaken by qualified staff trained by Siemens Building Technologies.
•
When the central control unit is in commissioning mode, control will remain off,
that is, all outputs are set to a defined OFF state.
•
In that case, all internal safety functions of the central control unit will also be
deactivated. Communication also stays inactive.
5.1.2
Potential impact of power failures
As mentioned above, certain activities of the central control unit will be interrupted
during commissioning. In the case of distributed plant, this can have the effect of a
partial power failure.
The possible effects are investigated and explained using a plant example with the
following devices:
Room unit
Function
RMB795B
Preselection of operating modes for the different room groups
RXB/RXL,
RDG/RDF/RDU
Room controllers and room thermostats, assigned to different
room groups.
RMU7..
(or RMH760)
Collection of the refrigeration / heat request signals of
preparation
A power failure or wrong configuration of communication has exactly the same
effect as if the respective device was in commissioning mode.
The following table shows the results in detail:
Case
RMB795B
RXB/RXL,
RDG/RDF/RDU
RMU7...
Potential effect
1
Power failure /
commissioning
mode
Operating mode
Comfort.
According to the
request signals
Preparation may
also be in progress
during the night
2
Normal
operation Power failure /
commissioning
mode
No demand
→
OFF
No room control and
no preparation
3
Normal operation
By operating mode
RMB795B
Power failure /
commissioning
mode
No preparation
Starting point
Plant example
Results