Introduction
9
Building Technologies
048_DMS_MK8000_ICC_MP4.30_A6V10062407_a_en
Fire Safety & Security Products
06.2010
10 Configuration is loaded onto the station(s), and tested
Commissioning, p. 65
11 3rd party integration team connects OPC client to MK8000
Once the client is connected, the 3
rd
party integration team should
be able to continue without further DU support
Commissioning, p. 65
12
System is ‘acceptance tested’
This is typically done with both the DU and the 3rd party integra-
tion team working through any problems together.
13
Project is handed over to the customer
Once the system is running according to plan, the customer ac-
cepts the system and the project is closed.
14
Maintenance contract begins
If the customer purchased a maintenance contract, the DU begins
performing routine maintenance and troubleshooting procedures.
2.1
What has been changed in MP 4.30
This section illustrates the new features of MK8000 MP4.30 in comparison with
previous MP4.20.
Section, Page
Improvements
Requirements aligned with MM8000.
Faster CPU and larger RAM memory recommended for large
configuration
2.1.1
Documentation changes and corrections in this edition
The following is the list of corrections and improvements (not related to new soft-
ware features) included in this edition of the document.
Section, Page
Modifications
Recommendations about “Data Privacy and Protection”
Requirements for Secure Operations