3-13
RIG
GING
Rigging information
Mounting the rigging grommet
Rigging grommet description
a
Battery cable
b
Extension wiring harness
c
Analog tachometer (optional)
Installing the shift cable and throttle
cable (remote control model)
Always perform the cable adjustment in
advance, following the procedures in the
remote control operation manual.
1.
Remove the grommet holder.
2.
Remove the grommet
1
and cable guide
2
.
3.
Fit the cable guide
2
into the grooves
a
of the shift cable
3
and throttle cable
4
,
and then install the cable guide
2
, shift
cable
3
, and throttle cable
4
.
4.
Fully screw in the shift cable joint
5
to
the shift cable
3
.
5.
Set the remote control lever to the N
position.
6.
Check that the shift link lever
6
is in the
N position.
7.
Make a mark
b
on the fully retracted
inner cable, and then make a mark
c
on
the fully extended inner cable.
8.
Make a mark
d
in the middle point
between marks
b
and
c
, and then align
the mark
d
with the outer cable edge
e
.
b
c
a
2
1
a
2
3
4
3
5
N
R
F
6
Содержание Kingfish 25
Страница 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Страница 4: ......
Страница 20: ...0 15 GEN INFO General information MEMO...
Страница 45: ...1 25 SPEC Specification MEMO...
Страница 65: ...2 19 TECH FEA Technical features and description MEMO...
Страница 81: ...3 17 RIG GING Rigging information MEMO...
Страница 215: ...7 67 POWR Power unit MEMO...
Страница 229: ...LOWR Lower unit 8 11 0 A...
Страница 242: ...8 24 8 Shimming Shim location T1 T2 T3 T3 A3 B3 42 5 T1 T2 24 0 24 0 B2 A1 A2 B1 Drive shaft and lower case Shimming...
Страница 259: ...LOWR Lower unit 8 41 5 Install new O rings C and D Ball bearing attachment B 90890 06633 A G B C D...
Страница 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Страница 394: ......
Страница 395: ......