5-17
ELEC
Electrical system
Checking the engine start switch
(remote control model)
1.
Disconnect the 10-pin main wiring har-
ness coupler.
2.
Measure the engine start switch input
voltage at the 10-pin main wiring harness
coupler
a
.
3.
Move the remote control lever to the N
position.
4.
Check the engine start switch for continu-
ity.
5.
Connect the 10-pin main wiring harness
coupler.
Checking the engine shut-off switch
(tiller handle model)
1.
Disconnect the engine shut-off switch
connector
a
and ground terminal
b
.
2.
Check the engine shut-off switch
1
for
continuity between the engine shut-off
switch connector
a
and the ground ter-
minal
b
.
Engine start switch input voltage
(reference data):
Terminal
b
–Terminal
c
12 V (battery voltage)
b
a
c
d
e
f
g
OFF
ON
START
Engine start switch continuity:
Switch
position
Terminal
d
e
f
g
OFF
START
W
W
B
1
a
b
b
a
c
d
e
Содержание Kingfish 25
Страница 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Страница 4: ......
Страница 20: ...0 15 GEN INFO General information MEMO...
Страница 45: ...1 25 SPEC Specification MEMO...
Страница 65: ...2 19 TECH FEA Technical features and description MEMO...
Страница 81: ...3 17 RIG GING Rigging information MEMO...
Страница 215: ...7 67 POWR Power unit MEMO...
Страница 229: ...LOWR Lower unit 8 11 0 A...
Страница 242: ...8 24 8 Shimming Shim location T1 T2 T3 T3 A3 B3 42 5 T1 T2 24 0 24 0 B2 A1 A2 B1 Drive shaft and lower case Shimming...
Страница 259: ...LOWR Lower unit 8 41 5 Install new O rings C and D Ball bearing attachment B 90890 06633 A G B C D...
Страница 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Страница 394: ......
Страница 395: ......