5-29
ELEC
Electrical system
OL: Indicates an overload
TIP:
Make sure to set the measurement range
g
,
and display the mark
h
by pushing the
“SHIFT” switch when checking the Rectifier
Regulator continuity.
7.
Connect the Rectifier Regulator couplers,
and then install the flywheel magnet
cover.
PTT electrical system
Checking the PTT relay
1.
Measure the input voltage between the
PTT relay terminals
a
and
b
.
2.
Disconnect the battery power source,
ground lead, PTT motor leads, and PTT
relay coupler.
NOTICE:
Always discon-
nect the battery negative terminal
before disconnecting the PTT relay
terminals.
3.
Connect the special service tool
1
.
4.
Check the PTT relay for continuity.
Replace if out of specification.
Rectifier Regulator continuity
(testing diode mode)
Tester lead
Display value (V)
(reference data)
+
-
c
d
OL
e
0.441
f
OL
d
c
OL
e
0.446
f
OL
e
c
OL
d
OL
f
OL
f
c
0.428
d
0.437
e
0.700
f
d
c
e
d
c
f
e
g
h
PTT relay input voltage:
Terminal
a
–Terminal
b
12.0 V (battery voltage)
b
a
Содержание Kingfish 25
Страница 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Страница 4: ......
Страница 20: ...0 15 GEN INFO General information MEMO...
Страница 45: ...1 25 SPEC Specification MEMO...
Страница 65: ...2 19 TECH FEA Technical features and description MEMO...
Страница 81: ...3 17 RIG GING Rigging information MEMO...
Страница 215: ...7 67 POWR Power unit MEMO...
Страница 229: ...LOWR Lower unit 8 11 0 A...
Страница 242: ...8 24 8 Shimming Shim location T1 T2 T3 T3 A3 B3 42 5 T1 T2 24 0 24 0 B2 A1 A2 B1 Drive shaft and lower case Shimming...
Страница 259: ...LOWR Lower unit 8 41 5 Install new O rings C and D Ball bearing attachment B 90890 06633 A G B C D...
Страница 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Страница 394: ......
Страница 395: ......