BRKT
Bracket unit
9-65
2.
Install the PTT motor lead
4
, springs
5
,
circuit breaker
6
, brush holder
7
, and
brushes
8
and
9
, and then tighten the
screws
0
to the specified torque.
3.
Push the brushes
8
and
9
into the
brush holder, and then install the arma-
ture assembly
A
.
4.
Install the stator
B
, and then tighten the
screws
C
to the specified torque.
Installing the PTT motor
Do not reuse an O-ring, always replace it
with a new one.
1.
Install a new O-ring
1
, the joint
2
, the
spring
3
, and the PTT motor assembly
4
, and then tighten the bolts
5
to the
specified torque.
Brush holder screw
0
:
1 N·m (0.1 kgf·m, 0.7 ft·lb)
Stator screw
C
:
2 N·m (0.2 kgf·m, 1.5 ft·lb)
4
6
5
5
7
8
9
0
0
A
9
8
B
C
C
PTT motor assembly bolt
5
:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
3
1
2
4
5
5
5
5
Содержание Kingfish 25
Страница 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Страница 4: ......
Страница 20: ...0 15 GEN INFO General information MEMO...
Страница 45: ...1 25 SPEC Specification MEMO...
Страница 65: ...2 19 TECH FEA Technical features and description MEMO...
Страница 81: ...3 17 RIG GING Rigging information MEMO...
Страница 215: ...7 67 POWR Power unit MEMO...
Страница 229: ...LOWR Lower unit 8 11 0 A...
Страница 242: ...8 24 8 Shimming Shim location T1 T2 T3 T3 A3 B3 42 5 T1 T2 24 0 24 0 B2 A1 A2 B1 Drive shaft and lower case Shimming...
Страница 259: ...LOWR Lower unit 8 41 5 Install new O rings C and D Ball bearing attachment B 90890 06633 A G B C D...
Страница 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Страница 394: ......
Страница 395: ......