Rostock MAX v2 Assembly Guide – 4thEd.
9.2 – Installing the End Stop Screws..............................................................................................82
9.3 – Installing the Drive Belts and Carriages................................................................................82
9.4 – Assembling the Carriage Spring Arms..................................................................................84
9.5 – Installing the Carriages on the Towers..................................................................................86
9.6 – Attaching the Belts to the Carriage........................................................................................87
9.7 – Installing the Axle Adapters...................................................................................................88
9.8 – Adjusting the Belt Tension....................................................................................................88
10 – Assembling and Installing the EZStruder........................................................................................89
10.1 – Assembling the EZStruder...................................................................................................89
10.2 – Installing & Mounting the EZStruder..................................................................................92
10.3 – Wiring the EZStruder Stepper Motor..................................................................................96
11 – Installing the Hot End and Bowden Tube........................................................................................98
11.1 – Preparing the Hot End Wiring.............................................................................................98
11.2 – Hot End Prep......................................................................................................................100
11.3 – Wiring the Hot End............................................................................................................100
11.4 – Attaching the Hot End to the Hot End Mounting Plate.....................................................103
11.5 – Installing the Bowden Tube...............................................................................................104
12 – Installing the Effector Platform and Delta Arms............................................................................105
12.1 – Assembling the Effector Platform.....................................................................................105
12.2 – Installing the Ball-Cup Delta Arms & Effector Platform..................................................106
13 – Installing the Hot End....................................................................................................................108
14 – Finishing the Top End....................................................................................................................109
14.1 – Installing the Spool Holder................................................................................................109
14.2 – Installing the Top Plate and Spool Support Arm................................................................111
15 – Installing the Onyx Heated Bed.....................................................................................................114
16 – Assembling & Installing the LCD Panel Mount............................................................................116
16.1 – Assembling the Front Panel...............................................................................................116
16.2 – Installing the LCD Trim Panels.........................................................................................118
17 – Installing & Connecting the RAMBo Controller...........................................................................120
17.1 – Preparing the RAMBo Mounting Plate.............................................................................120
17.2 – Mounting the RAMBo Controller.....................................................................................121
17.3 – Wire Prep: End Stops.........................................................................................................123
17.4 – Wire Prep: The Hot End Thermistor Connector................................................................124
17.5 – Wire Prep: The Heated End Thermistor Connector...........................................................125
17.6 – Wire Prep: Extruder Motor Connector..............................................................................125
17.7 – Wiring the RAMBo Controller – Terminal Block.............................................................126
17.8 – Plugging cabling into the RAMBo....................................................................................128
17.9 – Installing the RAMBo Into The Machine Base.................................................................130
17.10 – Installing the Power Switch and LCD Controller Cables................................................131
18 – Final Assembly Tasks.....................................................................................................................133
18.1 – Attaching the Base Covers & LCD Panel..........................................................................133
18.2 – Attaching the USB Cable...................................................................................................134
18.3 – Installing the Acrylic Cover Panels...................................................................................135
18.4 – Dem Feet...and the Borosilicate Glass Build Plate!...........................................................137
18.5 – Smoke Test!.......................................................................................................................138
– 4