Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by SEAT S.A. SEAT S.A does not guarantee or accept any liability with
respect to the correctness of information in this document. Copyright by SEAT S.A.
– Slide screw driver -2- into the recess -arrow- from the turbo‐
charger and lever out the sealing ring -1-.
Note
♦
Renew gaskets, O-rings and securing nuts used for securing
turbocharger to cylinder head.
♦
Charge the turbocharger with engine oil using the connection
sleeve of the oil supply pipe.
♦
Secure all hose connections with the hose clips corresponding
to original equipment ⇒ Electronic parts catalogue .
♦
After installing turbocharger, run engine for about 1 minute at
idling speed to ensure that oil is supplied to turbocharger. It is
important not to operate the engine at higher speeds at this
point.
– Electrical connections and routing ⇒ Current flow diagrams,
Electrical fault finding and Fitting locations.
Specified torques
♦
⇒ “1.1 Exploded view - turbocharger”, page 189
♦
⇒ Fig. ““Install air ducts with screw-type clips”“ , page 199
♦
⇒ Fig. ““Install air ducts with screw-type clips”“ , page 199
♦ ⇒ Running gear, axles, steering; Rep. gr. 40 ; Drive shaft;
Overview: drive shaft
1.3
Removing and installing charge pressure positioner - V465-
Special tools and workshop
equipment required
♦ Split pin - T40265-
León 2013 ➤ , León ST 2013 ➤
4-cylinder petrol engine (1.2 l direct injection, 4 V, turbocharger, EA211) - Edition 02.2017
1. Turbocharger
195