![Seakeeper 7000A GYRO Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/seakeeper/7000a-gyro/7000a-gyro_installation-manual_1223535027.webp)
INSTALLATION
MANUAL
Product:
Document
#:
Rev:
Page:
MODEL
7000A
GYRO
90051
3
15
of
16
Section
2:
ELECTRICAL
INSTALLATION
3.
ROUTE
2
ND
OPERATOR
STATION
CABLE
a.
Customer
supplied
CABLE
19
is
the
same
cable
material
as
CABLE
5:
6x20AWG
shielded
cable
with
a
maximum
outer
diameter
of
8mm
(0.315
inch).
b.
CABLE
19
must
be
routed
and
installed
in
the
vessel
between
the
1
st
and
2
nd
Operator
Stations.
4.
INSTALL
2
ND
OPERATOR
STATION
EQUIPMENT
a.
The
2
nd
Operator
Station
equipment
is
installed
at
the
determined
location
using
Electrical
Equipment
Mounting
Instructions
in
Section
2.1
steps
3
‐
6.
5.
CONNECT
2
ND
OPERATOR
STATION
EQUIPMENT
a.
The
2
nd
Operator
Station
equipment
is
connected
in
accordance
with
Note
3
of
the
Cable
Block
Diagram,
90034.
b.
The
two
additional
Serial
Comms
Breakout
Boxes
are
connected
as
shown
in
Figure
15.
TERMINAL BLOCKS
TERMINAL BLOCKS
CABLE 19
6 x 20AWG, OVERALL SHIELD
FIGURE
15
–
CABLE
23
TERMINATION
AT
2
ND
&
3
RD
SERIAL
COMMS
BREAKOUT
BOXES
Содержание 7000A GYRO
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...THIS PAGE INTENTIONALLY LEFT BLANK...