Zone 2 element settings with a reach of 120% of protected line impedance account for the effects
of infeed. This point must be verified using a fault study to calculate the apparent ohms at the
local terminal for a fault at the remote end of the transmission line. In the example system, 120%
is selected for the Zone 2 elements with assurance that all faults in line 2 are detectable, even
with infeed from the remote terminals.
Assuming the Zone 1 reach for the line protection at Breakers 5 and 11 is set for 80% of the line
impedances of Lines 3 and 6 respectively, verify that a Zone 2 reach of 120% for Breaker 3 does
not overreach the Zone 1 elements at Breakers 5 and 11.
Line 2 Imp [0.8
⋅
Line 3 Impedance] = 78.03
Ω
+ [0.8 • 39.12
Ω
]
= 109.33
Ω
primary
When Zone 2 at Breaker 3 has a set reach of 120%, the effective reach is:
Zone 2 at Bkr. 3 = 1.20
⋅
78.03
Ω
= 93.64
Ω
primary
∠
84
°
Since 93.64
Ω
< 109.33
Ω
, the Zone 2 setting of 120% at Breaker 3 does not overreach the
Zone 1 protection of Lines 3 and 6. Any effect of infeed tends to increase the apparent ohms
seen at Breaker 3 for faults on Lines 3 and 6.
The Zone 2 quadrilateral element setting is based upon the same requirement established for the
Zone 2 mho elements. The reactive reach is set the same as the mho distance setting. The
resistive reach determines sensitivity for high resistance faults on a radial basis. For this
example, the Zone 2 resistive reach is set for 50
Ω
primary.
Zone 3 Setting
This example uses a Permissive Overreaching Transfer Trip (POTT) communications scheme.
The current reversal block, echo and weak-infeed logic require reversal of the Zone 3 elements.
The Zone 3 element reach at Breaker 3 must be selected to detect all out-of-section faults also
detected by the overreaching elements at Breaker 4. At a minimum, the Zone 3 reach setting
must equal the impedance the overreaching element at Breaker 4 sees beyond Breaker 3.
Assuming the Zone 2 reach for the line protection at Breaker 4 is set for 120% of the line
impedance of Line 2, the Zone 3 reach at Breaker 3 is set at 120% of the Zone 2 overreach from
Breaker 4.
When Zone 2 at Breaker 4 has a set reach of 120%, the effective reach is:
Zone 2 at Bkr. 4 = 1.20
⋅
78.03
Ω
= 93.64
Ω
∠
84
°
The Breaker 4 overreach is equal to the Zone 2 setting minus the line impedance:
93.64 - 78.03
Ω
= 15.61
Ω
primary
Zone 3 Reach = 1.2
⋅
15.61
Ω
primary
∠
84° = 18.73
Ω
primary
∠
84°
Содержание SEL-321
Страница 4: ......
Страница 10: ......
Страница 12: ......
Страница 78: ...2 54 Specifications Date Code 20011026 SEL 321 321 1 Instruction Manual Figure 2 4 Logic Symbol Legend ...
Страница 87: ...Date Code 20011026 Specifications 2 63 SEL 321 321 1 Instruction Manual Figure 2 21 Load Encroachment Logic ...
Страница 94: ...2 70 Specifications Date Code 20011026 SEL 321 321 1 Instruction Manual Figure 2 29 Voltage Element Logic ...
Страница 162: ......
Страница 171: ...Date Code 20011026 Event Reporting 4 9 SEL 321 321 1 Instruction Manual ...
Страница 263: ...SEL DIRECTION AND POLARITY CHECK FORM ...
Страница 264: ......
Страница 265: ...SEL DIRECTION AND POLARITY CHECK FORM ...
Страница 266: ......
Страница 270: ......
Страница 358: ......
Страница 360: ......
Страница 362: ......
Страница 366: ......
Страница 370: ......
Страница 390: ......