Assembly and initial operation
16
01/RPE/en/2011-08-04/SK-CW
6
Assembly and initial operation
6.1
Mechanical connection
WARNING
Risk of injury when the machine/system moves
unexpectedly!
Switch off power supply.
Make sure that there is no more residual energy in the
system
WARNING
Risk of injury from falling of the unit during assembly!
Secure unit during assembly with adequately sized straps.
Note the tightening torque of fixing screws.
WARNING
Risk of injury when the machine/system moves
unexpectedly, by moving of the linear axis!
Switch off power supply before assembly and maintenance.
Make sure that there is no more residual energy in the
system
The mechanical connection hast o be carried out at the linear
axis Beta 80 ZSS.
Information on mounting the linear axis Beta contains the service
manual Beta-80-100-140-ZRS-ZSS Appendix 1 -Chapter 6, from
page 20.
Содержание RPE 100
Страница 24: ...24 01 RPE en 2011 08 04 SK CW ...
Страница 25: ...Appendix 1 Linear axis Beta ...
Страница 26: ...2 01 LPE de 2011 03 18 SK CW ...
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 33: ......
Страница 71: ......
Страница 110: ...Appendix 2 Drive MSK ...
Страница 111: ...2 01 LPE de 2011 03 18 SK CW ...