
INTEGRA/-S/-G/-GS User Manual INSTALLATION
SAF Tehnika JSC
21
Integra-S/Integra-GS 6-13GHz* 2+0 & OMT
interconnection
Tools required
: Size 5 Allen wrench, 240mm
10mm (0.394”) wrench (not supplied)
8mm (0.315”) wrench (not supplied)
Level (not supplied)
It is recommended to perform steps 1-2 on the ground.
1
Prepare Integra-S/Integra-GS 6-13GHz* FODU
by loosening both bottom clamps (should not
overlap the flange plate) and tightening both
upper clamps (will be used as a hook).
2
Attach Integra-S/Integra-GS 6-13GHz* FODU
to the OMT using both upper clamps
Integra-
S/Integra-GS 6-13GHz* FODU features twisted
polarization flange and resulting signal
polarization is determined by Interface on
antenna/OMT. To change signal polarization,
please rotate only the antenna interface, as
the radio always remains in a vertical position
3
Slightly tighten both bottom fixation clamps to
secure FODU to the OMT.
4
Use the air level to verify that FODUs are
properly leveled. Note that the radio position
should be in parallel with the OMT. Thus, if the
antenna is inclined or declined in elevation,
the radio position should be kept at the same
angle.
Содержание Integra
Страница 1: ...SAF Tehnika JSC 1 User manual Integra Integra S Integra G Integra GS VER 2 37 FW 3 20 19...
Страница 46: ...INTEGRA S G GS User Manual WEB GUI SAF Tehnika JSC 46 Modify mode Slave status after enabling aggregation...
Страница 47: ...INTEGRA S G GS User Manual WEB GUI SAF Tehnika JSC 47 Master status after enabling aggregation Press button...
Страница 63: ...INTEGRA S G GS User Manual WEB GUI SAF Tehnika JSC 63 Status mode Press button...
Страница 88: ...INTEGRA S G GS User Manual WEB GUI SAF Tehnika JSC 88 Status mode Press button...
Страница 94: ...INTEGRA S G GS User Manual WEB GUI SAF Tehnika JSC 94 Status mode...