PREPARAZIONE ARIA
Distanziatore a stella
Distanziatore doppia rotella
T6878
Deviatore finale
YV3-2
ARIA COMPRESSA NON REGOLATA
YV3-4
4
2
5 1
3
YV3-4
YV3-2 YV13-4
YV3
YV3-1
YV13
4
2
5 1
3
YV13-1
A A
B
B
C C
YV13-1
YV3-1
YV1/2-1
SP1
YV101-1
YV102-1
YV30-1
3
2
1
YV30
YV102
YV101
3
2
1
4
2
5 1
3
YV13-4
YV13
4
2
5 1
3
4
2
5 1
3
YV3
YV1/2
YV1/2-4
YV1/2-2
YV3-4
YV3-2
YV3-4
YV3-2
YV13-4
YV13-4
D
D
YV104-1
YV103-1
3
2
1
3
2
1
YV103
YV104
062AZ005A
FEATURES
2
2-29
FIGURE 2.4.1/B - CHS200 PNEUMATIC SYSTEM DIAGRAM
A
Main shut-off valve
SP1
Pressure switch
YV1/2
Final diverter control
YV3
Cap feed piston control
YV13
Blower supply control
YV30
SPARK TESTER reject/belt cleaning
YV101
Standard conveyor reject
YV102
Control of standard conveyor reject
YV103
Overturned conveyor reject
YV104
Control of overturned conveyor reject
Double roller spacer
Final spacer
Turn-plate spacer
COMPRESSED AIR NOT ADJUSTED
AIR PREPARATION
Содержание Imola CHS Series
Страница 2: ......
Страница 4: ...062AZ005A...
Страница 8: ...062AZ005A TABLE OF CONTENTS Page 0 8 9 DISMANTLING 9 1 9 1 DECOMMISSIONING 9 1 9 2 DISMANTLING 9 2...
Страница 15: ...062AZ005A GENERAL INFORMATION 1 1 7 FIGURE 1 8 B CHS200 MACHINE IDENTIFICATION PLATE T6864 E0206...
Страница 48: ...062AZ005A 2 FEATURES 2 32...
Страница 74: ...062AZ005A 4 INSTALLATION 4 8 FIGURE 4 3 2 1 B CONNECTING THE SPARK TESTER DEVICE ELECTRIC CABLES...
Страница 76: ...062AZ005A 4 INSTALLATION 4 10...