2A3/4
3-3-49
12. Refit all removed parts.
Important:
∗
After replacing the drum, run maintenance items U110 "Checking/clearing the drum
count" and U111 "Checking/clearing the drum drive time."
∗
After running maintenance item U160, loosen the blade pin and position the cleaning
blade against the drum.
∗
When installing the drum, orient correctly with the thinner end of the drum flange shaft
at the machine front and the thicker end at the machine rear.
Drum
Machine rear
Machine front
Drum flange
Drum flange
Figure 3-3-58
∗
When refitting the toner sub-hopper, align the toner sub-hopper hole with the
developing unit hole and connect the coupling to the joint.
∗
When installing the main charger assembly, fix the assembly pushed all the way
toward the machine front.
Hole
Joint
Hole
Toner sub-hopper
Coupling
Figure 3-3-59
Содержание Ri 4230
Страница 1: ...4230 5230 S M MCA SERVICE MANUAL Published in June 00 2A370941 Revision 1 Ri 4230 5230 Ri 4230 5230 ...
Страница 3: ...SERVICE MANUAL Ri 4230 5230 ...
Страница 13: ...4230 5230 S M MCA THEORY AND CONSTRUCTION SECTION I I Theory and Construction Section ...
Страница 14: ...1 1 5 2A3 4 CONTENTS 1 1 Specifications 1 1 1 Specifications 1 1 1 ...
Страница 21: ...1 1 7 2A3 4 CONTENTS 1 2 Handling Precautions 1 2 1 Drum 1 2 1 1 2 2 Developer and toner 1 2 1 ...
Страница 100: ...4230 5230 S M MCA ELECTRICAL SECTION II II Electrical Section ...
Страница 119: ......
Страница 138: ......
Страница 159: ...4230 5230 S M MCA III Set Up and Adjustment Section III SET UP AND ADJUSTMENT SECTION ...
Страница 419: ...1 1 25 2A3 4 CONTENTS 3 5 Self Diagnosis 3 5 1 Self diagnosis 3 5 1 1 Self diagnostic function 3 5 1 ...
Страница 448: ...2A3 4 3 6 3 25 Toner scatters at the leading edge of the image See page 3 6 17 ...