3-1-2
2A3/4
( 2 ) Installation procedure
Unpack.
Remove the tapes. (52 ppm)
Remove the tapes. (42 ppm)
Make test copies.
Install the copy tray*
3
and
paper size label sheet.
Check the toner sensor control
voltage and toner feed start level
(maintenance items U131 and U156).
Remove pins holding light source
units 1 and 2.
Load developer.
Connect the power cord.
Adjust the height adjuster.*
2
Install a toner cartridge.
Install the feed bottom protector
(only for 42 ppm).*
1
Release the cleaning blade.
Apply toner to the cleaning blade
(maintenance item U160).
Exit maintenance mode.
Start
Install the drum.
Adjust the fixing pressure.
Carry out initial developer setting
(maintenance item U130).
Remove the developing unit.
Completion of the machine installation.
*1: When neither the paper feed desk nor the large paper deck is installed.
*2: When the paper feed desk or the large paper deck is installed.
*3: For 220 - 240 V specifications only.
Содержание Ri 4230
Страница 1: ...4230 5230 S M MCA SERVICE MANUAL Published in June 00 2A370941 Revision 1 Ri 4230 5230 Ri 4230 5230 ...
Страница 3: ...SERVICE MANUAL Ri 4230 5230 ...
Страница 13: ...4230 5230 S M MCA THEORY AND CONSTRUCTION SECTION I I Theory and Construction Section ...
Страница 14: ...1 1 5 2A3 4 CONTENTS 1 1 Specifications 1 1 1 Specifications 1 1 1 ...
Страница 21: ...1 1 7 2A3 4 CONTENTS 1 2 Handling Precautions 1 2 1 Drum 1 2 1 1 2 2 Developer and toner 1 2 1 ...
Страница 100: ...4230 5230 S M MCA ELECTRICAL SECTION II II Electrical Section ...
Страница 119: ......
Страница 138: ......
Страница 159: ...4230 5230 S M MCA III Set Up and Adjustment Section III SET UP AND ADJUSTMENT SECTION ...
Страница 419: ...1 1 25 2A3 4 CONTENTS 3 5 Self Diagnosis 3 5 1 Self diagnosis 3 5 1 1 Self diagnostic function 3 5 1 ...
Страница 448: ...2A3 4 3 6 3 25 Toner scatters at the leading edge of the image See page 3 6 17 ...