Operation
Bunker
6.19.1
Unfolding/folding of unload conveyor articulation parts
Before lowering the unload conveyor, first swing out both articulation parts of the
unload conveyor.
ATTENTION
Risk of machine damage.
When folding the unload conveyor articulation part out and in, some machine parts
may collide and therefore seriously damage the machine. That's why always pay
attention to the right order when folding the bunker out and in! (
Fold-unfold unload con-
veyor articulation part 1
Fold-unfold unload con-
veyor articulation part 2
Choose this function with R-Select.
+
Key = Unfold unload conveyor articulation part (working position)
-
Key = Fold unload conveyor articulation part (transport position)
ADVICE
If you fold in the unload conveyor by pressing the mini-joystick (
15
) to the right ("End
of bunker unloading") on the control panel for bunker unloading while lifting, the artic-
ulation parts of the unload conveyor fold into the lifting position. When lowering manu-
ally the unload conveyor, the unload conveyor articulation part 1 moves automatically
to the straight position, and the unload conveyor articulation part 2 moves to the same
position, in which it was during the last manual raising of the whole unload conveyor.
Unload conveyor articulation part 1 and
2 in operating position
Unload conveyor articulation part 1 and
2 in transport position
314 / 560
Содержание Panther 2S
Страница 3: ...Contents Contents 3 560...
Страница 4: ...Contents 4 560...
Страница 13: ...Preface 1 Preface 13 560...
Страница 14: ...Preface 14 560...
Страница 22: ...Safety 22 560...
Страница 23: ...Safety 2 Safety 23 560...
Страница 24: ...Safety 24 560...
Страница 42: ...General View and Specifications 42 560...
Страница 43: ...General View and Specifications 3 General View and Specifications 43 560...
Страница 44: ...General View and Specifications 44 560...
Страница 55: ...General Description 4 General Description 55 560...
Страница 56: ...General Description 56 560...
Страница 59: ...Operating Components 5 Operating Components 59 560...
Страница 60: ...Operating Components 60 560...
Страница 64: ...Operating Components Driver s cabin overview 14 15 14 First aid kit 15 Blow gun 64 560...
Страница 101: ...Operation 6 Operation 101 560...
Страница 102: ...Operation 102 560...
Страница 224: ...Operation Defoliator Defoliator RISU Defoliator RES 224 560...
Страница 326: ...Operation Bunker unloading 6 20 Bunker unloading 326 560...
Страница 328: ...Operation Bunker unloading 20 15 18 17 16 19 22 21 Overview of keys and mini joystick See Page 90 328 560...
Страница 357: ...Maintenance and Service 7 Maintenance and Service 357 560...
Страница 358: ...Maintenance and Service 358 560...
Страница 466: ...Malfunction and Remedies 466 560...
Страница 467: ...Malfunction and Remedies 8 Malfunction and Remedies 467 560...
Страница 468: ...Malfunction and Remedies 468 560...
Страница 499: ...Malfunction and Remedies Jacking up for wheel change 499 560...
Страница 511: ...Lists Tables Plans Diagrams Maintenance Verification 9 Lists Tables Plans Diagrams Maintenance Verification 511 560...
Страница 512: ...Lists Tables Plans Diagrams Maintenance Verification 512 560...
Страница 546: ...Lists Tables Plans Diagrams Maintenance Verification AdBlue information sheet 546 560...
Страница 548: ...Lists Tables Plans Diagrams Maintenance Verification Confirmation about instructions given to the driver 548 560...
Страница 554: ...Index 554 560...
Страница 555: ...Index 10 Index 555 560...
Страница 556: ...Index 556 560...