Pub. No. 1290 - January 2010
15
7. Weld the base frame to the pit floor according to
Figure 11. Use 7018 low hydrogen welding rod.
8. Disengage the following safety devices:
a. Push in the selector valve,
b. Turn on power,
c. Disengage the support latch by returning the
platform to dock height by pressing and holding
the Lift UP and MANUAL/RESET buttons. The
support latch will automatically disengage.
RITE-HITE
®
Dual-Dok
®
Combined Lift & Leveler System Owner’s Manual
INSTALLATION INSTRUCTIONS CONTINUED
12"
BASE FRAME ASSEMBLY
FLOOR MOUNTING PLATES
FOR CLARITY, DIAGRAM ONLY
SHOWS BASE FRAME AND PIT.
FRONT OF PIT
BACK
OF PIT
SIDE OF PIT
4"
ROLLER BAR
REAR PIN PLATES
NOTE:
IF SHIMMING IS REQUIRED, POSITION SHIMS BENEATH
ROLLER BARS AND REAR PIN PLATES. WELD 1/4"
FILLET ON ALL EXPOSED EDGES.
REAR SHIM
14" x 14"
(IF REQUIRED)
FRONT SHIM
8" x 19"
(IF REQUIRED)
TYP. (2)
TYP. (2)
TYP. (2)
TYP. (2)
DRAIN
ROLLER
FRONT PIT OPENING
FRONT
BASE ANGLE
NOTE:
CRITICAL AREA! THE FRAME MUST BE LEVEL!
24" LEVEL MUST BE PLACED ON FRONT CROSS MEMBER
12"
10"
3/4" ELECTRICAL CONDUIT
FOR HIGH VOLTAGE
3/4" ELECTRICAL CONDUIT
1 FOR CONTROL SYSTEM
1/4"
1/4"
1/4"
1/4"
DETAIL-A
FIGURE 11 - CENTERING AND LEVELING DETAIL
Ground the welder to the BASE FRAME ONLY.
Содержание DUAL-DOK 2200
Страница 2: ...2 Pub No 1290 January 2010 RITE HITE Dual Dok Combined Lift Leveler System Owner s Manual NOTES...
Страница 61: ...Pub No 1290 January 2010 61 RITE HITE Dual Dok Combined Lift Leveler System Owner s Manual NOTES...
Страница 81: ...Pub No 1290 January 2010 81 RITE HITE Dual Dok Combined Lift Leveler System Owner s Manual NOTES...
Страница 82: ...82 Pub No 1290 January 2010 RITE HITE Dual Dok Combined Lift Leveler System Owner s Manual NOTES...
Страница 83: ...Pub No 1290 January 2010 83 RITE HITE Dual Dok Combined Lift Leveler System Owner s Manual NOTES...