3 How to Install Calorimeter
3-2. Installation procedure and required maintenance space
20 / 87
3-2. Installation procedure and required maintenance
space
Install the OHC-800 and the
sampling device on the surface of a
robust wall or a freestanding rack
etc. using bolts.
Before installation, a maintenance
space shown in the figure on the
right must be secured.
Be sure to secure this space during
construction planning or installation.
Maintenance space (Unit: mm)
CAUTION
Do not drop or give strong shock to the calorimeter during transportation or installation.
Otherwise, the calorimeter may be damaged, or the explosion-proof performance may be lost.
When installing the calorimeter on a freestanding rack (fixed type), fix the freestanding rack with
anchor bolts.
If the calorimeter is to be fixed on the wall, install it properly where it can hold its weight.
When performing construction work, prevent dust from entering the inside of the calorimeter.
Содержание OHC-800
Страница 1: ...PT3E 04914 Explosion Proof Calorimeter OHC 800 Operating Manual...
Страница 88: ......