Commissioning
6
40
Opening the metering slider:
1.
Close the metering slider fully using the control valve.
2.
Set the volume end stop to the maximum value.
3.
Open the metering slider fully using the control valve.
The hydraulic cylinder is at the end stop.
The return spring remains under tension.
Figure 6.9:
Metering slider open, hydraulic cylinder at end stop
Содержание 18.1
Страница 30: ...Machine data 4 24...
Страница 32: ...Transport without tractor 5 26...
Страница 108: ...Service and maintenance 9 102...