Remote Commands to Perform Measurements with I/Q Data
R&S
®
FSV/A3000 I/Q
Analyzer
211
User Manual 1178.8536.02 ─ 01
To prevent overlapping execution of the subsequent command before the measure-
ment has been aborted successfully, use the
*OPC?
or
*WAI
command after
ABOR
and
before the next command.
For details see the "Remote Basics" chapter in the R&S
FSV/A User Manual.
To abort a sequence of measurements by the Sequencer, use the
command.
Note on blocked remote control programs
:
If a sequential command cannot be completed, for example because a triggered sweep
never receives a trigger, the remote control program will never finish and the remote
channel to the R&S
FSV/A is blocked for further commands. In this case, you must
interrupt processing on the remote channel first in order to abort the measurement.
To do so, send a "Device Clear" command from the control instrument to the
R&S
FSV/A on a parallel channel to clear all currently active remote channels.
Depending on the used interface and protocol, send the following commands:
●
Visa
:
viClear()
Now you can send the
ABORt
command on the remote channel performing the mea-
surement.
Example:
ABOR;:INIT:IMM
Aborts the current measurement and immediately starts a new
one.
Example:
ABOR;*WAI
INIT:IMM
Aborts the current measurement and starts a new one once
abortion has been completed.
Usage:
Event
INITiate<n>:CONMeas
This command restarts a (single) measurement that has been stopped (using
ABORt
)
or finished in single sweep mode.
The measurement is restarted at the beginning, not where the previous measurement
was stopped.
Suffix:
<n>
.
irrelevant
Capturing Data and Performing Sweeps