80
ESPLXD-ET Controller
Station Sequencing
The ESPLXD-ET offers advanced programming features to optimize
water windows. The Station Sequencing option allows you to select
from two methods of station sequencing for program operation:
b
l
Sequence by Station Number (system default).
b
l
Sequence by Station Priority (required when using FloManager).
This option decreases the overall time required to complete the
program when operating multiple stations simultaneously.
Station Sequencing by Station Numbers will select stations to
operate in the following order:
1
Station number
1 > 2 > 3 . . .
2
Program assignment
A > B > C > D
b
b
NOTE:
Non-irrigation priority stations will always be selected to
operate first.
Station Sequencing by Station Priority will select stations to
operate in the following order:
1
Station priority
Non-Irrigation > High > Medium > Low
2
Station run time
Longest run time > shortest run time
3
Station number
1 > 2 > 3 . . .
4
Program assignment
A > B > C > D
b
b
NOTE:
If FloManager is turned ON, then the default Station
Sequencing setting is Sequence by Station Priorities. To select
Station Sequencing by Station Number, FloManager must first
be turned OFF. See Section F, Flow Management, Enable/Disable
FloManager for more details.
b
g
Turn the controller dial to Station Settings.
A
The Station Settings screen appears. Press the Down Arrow button
to select Station Sequencing; then press Next.
B
The Station Sequencing screen appears. Press the + and – buttons
to set Station Sequencing by either Station Numbers or Station
Priorities, as desired.
1
2
b
b
NOTE:
When Station Sequencing is set to Sequence by Station
Priorities, you can still manually operate stations in station
number sequence using the Test All Stations option from the
Manual Watering dial position. See Section G, Auxiliary Operation,
Manual Watering, Test All Stations for more details.
ESPLXD-ET user-manual (670504-01) artwork_120716.indb 80
7/16/2012 3:48:26 PM