
36
ESPLXD-ET Controller
Create a Schedule Report
The ET Manager Scheduler Operation Guide, which is located on the Resource CD or available in the Help menu, contains detailed and helpful
instructions on creating a Schedule Report and should be used as a reference when creating a Schedule Report. Use the information from your Site
Assessment Worksheet to fill in the Schedule Report tabs.
a
A
From the ET Manager Scheduler home screen, select “New Schedule ETC-LX”.
ESPLXD-ET user-manual (670504-01) artwork_120716.indb 36
7/16/2012 3:48:13 PM