4
IS125 Conveyors | Installation & Maintenance Instructions
Installation
u
Check Your Shipment
Before opening the shipment, visually inspect the outside of the crate/box for shipping damage. Carefully unpack the crate/box, inspecting for component damage which
may have occurred inside the packing materials. Contact the carrier and QC Conveyors regarding any damage that may have occurred during shipment. Check the contents
of your shipment against the supplied packing slip and inform QC Conveyors of any discrepancies.
u
General Sequence of Installation
1
Mount conveyor to stands
or compatible mounting
brackets.
2
Attach sides or guides to
conveyor and adjust as
needed.
3
Install drive motor and
mounting package.
4
Conveyor should be lagged to
floor or caster locks engaged
before operation.
u
Assistance
If you need assistance, please contact QC Conveyors customer service department Monday through Friday, 8am-5pm EST at (513) 753-6000. In addition, your local
distributor has been trained at the factory and can provide support in many ways. You can also visit our website — qcconveyors.com — for additional information and
technical documents.