IS125 Conveyors | Installation & Maintenance Instructions
27
u
Installation of New Belt
>
If stand brackets are not used, skip steps 4 and 5.
1
Start at tail end and loop
belt over frame and into
idler cutout.
2
Slide belt over drive end.
3
Snap belt into flanges on
underside of conveyor.
4
Slide mounting bracket up
and align with mounting
holes.
5
Tighten hex head bolts to
secure mount to stand.
6
Screw torx head screws
through mount or stand
bracket and into accessory holes
on conveyor
7
Place idler pulley back onto
frame under belt.
8
Push idler pulley off tail end
until it “pops” into position.
9
Rotate pulley until set screw
is visible.
10
Back set screw out to
hold pulley in position.
>
If Drive Pulley and Bearing Plate were removed when existing belt was taken off, replace them now. Instructions can be found in drive pulley replacement section of this
manual.
Conveyor is now ready to be tracked as instructed in Tracking section of this manual.