Price Industries Limited
404 Egesz Street
Winnipeg, MB R2R 1X5
115 Turnbull Court
Cambridge, ON N1T 1C6
ANSI Z83.8
Commercial Industrial Gas Heating Equipment
CSA 2.6-2009
Industrial Package Gas Fired Package Furnaces
MANUFACTURED BY
FIRE OR EXPLOSION HAZARD
Failure to follow safety warning exactly could result in
serious injury, death or property damage.
Be sure to read and understand the installation, operation
and service instructions in this manual.
Improper installation, adjustment alteration, service or
maintenance can cause serious injury, death or property
damage.
• Do not store or use gasoline or other flammable vapors
and liquids in the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS
• Do not try and light any appliance.
• Do not touch any electrical switch; do not use any
phone in your building.
• Leave building immediately.
• Immediately call your gas supplier from a phone
remote from the building. Follow the gas supplier’s
instructions.
• If you cannot reach your gas supplier, call the fire
department.
• Installation and service must be performed by a
qualified installer, service agency or the gas supplier.
Overview
General Safety Information ............................................ 1
Safety Notices ............................................................... 1
Unit Description ............................................................. 2
Unit Nameplate ............................................................. 2
Unit Inspection .............................................................. 2
Installation Instructions
Mechanical Installation .................................................. 3
Vent Stack and Combustion Air Opening ....................... 7
Electrical Installation ...................................................... 9
Gas Piping Connection ................................................ 13
Hot Water and Chilled Water Coil Connections ............ 15
Safety Shut-off Valve Leak Check ................................ 17
Installation Checklist .................................................... 18
Supply Fan Start-Up .................................................... 20
Typical Sequence of Operation .................................... 23
Maintenance
Maintenance ............................................................... 24
Service and Warranty Procedure ................................. 25
AW-I Start-Up Report Form ......................................... 26
Quality Assurance Report ............................................ 28
Limited Warranty ......................................................... 29
Appendices
Appendix A: Assembly of Split Units ............................ 30
WARNING
AW-I
TABLE OF CONTENTS
Содержание AW-I Series
Страница 37: ...35 AW I NOTES priceindustries com AW I Manual...
Страница 38: ...36 AW I NOTES AW I Manual priceindustries com...
Страница 39: ...37 AW I NOTES priceindustries com AW I Manual...