36
Chapter 2
Flowchart
To wire each unit, follow the procedure shown in the following flowchart:
Before disconnecting or reconnecting a cable or connector, be sure to turn off the power.
DANGER
Redesigning
Recheck
No
Normal
Yes
Error
Designing of
S-LINK V
system
All conditions are
satisfactory (voltage drop,
address setting, etc.)
System starting
Learning of basic procedure
Refer to page 37 and following pages.
Refer to page 51 and following pages.
(For a detailed description, refer to page 73.)
(For a detailed description, refer to page 74.)
Connection of each unit
Cutting of cable depending on
specified cable length
Temporary starting of system
Installation of each unit of
S-LINK V
system
Setting of each unit address
Setting of PLC I/O connector numbers
(in case of using
SL-VCU1
)
Controller setting
Designing
Occurrence of error
(Error indication)
Содержание S-LINK V
Страница 2: ...2 ...
Страница 5: ...5 Before Using This System ...
Страница 12: ...12 Before Using This System MEMO ...
Страница 13: ...13 Chapter 1 Designing System ...
Страница 35: ...35 Chapter 2 Wiring ...
Страница 60: ...60 Chapter 2 MEMO ...
Страница 61: ...61 Chapter 3 Starting System ...
Страница 71: ...71 Chapter 4 Specifications ...
Страница 161: ...161 Chapter 5 Troubleshooting ...
Страница 169: ...169 Appendix ...
Страница 180: ...180 Appendix MEMO ...