Tools Required to Complete the hardware Installation
Electric Driver w/ Phillips Bit or Phillips Screwdriver
Wire Stripper
Small Flat Driver
Leveling Ruler
Accessories Parts Required to Complete the Hardware Installation
Enterprise Server -
2 #8 x ¾” screws
Network Coordinator screws are included
Paging Transmitter screws are included
Battery back- up -
2 #8 x ¾” screws
PalatiumCare UL2560 Comark PC
3 #8 x ¾”
System Mounting Board 4 wall dog 1-
1/4” screws for mounting PalatiumCare System
Ethernet Cat5e patch cable
Mounting or Clamp Ties (4 to 5)
Double sided tape 3 inches for securing the power adapter
Hardware Installation
This installation of the PalatiumCare System will apply to mounting the required hardware onto
the System Mounting Board and mounting the required hardware without the System Mounting
Board. The steps and techniques of how to mount each scenario is showing below.
Hardware requirements
1
System Mounting Board
1.
PalatiumCare Enterprise Server
2.
Network Coordinator
3.
Paging Transmitter
4.
Battery Back up
5.
PalatiumCare UL2560 Comark PC is optional piece of
hardware
Note:
The PalatiumCare UL2560 Alert station Comark All-In-One PC is optional. Refer to the
PalatiumCare UL2560 Desktop Application Installation and User.
Содержание Palcare PAL-211401
Страница 1: ...Copyright 2018 PalatiumCare Inc Page 1 2018 Install Manual PAL 211401 FW 2 1 66 ...
Страница 10: ...Copyright 2018 PalatiumCare Inc Page 10 2018 Mounting hardware Layout WITH System Mounting Board Figure 1 0 ...
Страница 11: ...Copyright 2018 PalatiumCare Inc Page 11 2018 Mounting Hardware Layout WITHOUT system Mounting Board Figure 1 1 ...
Страница 12: ...Copyright 2018 PalatiumCare Inc Page 12 2018 PalatiumCare UL2560 System Mounting Layout Typical Figure 1 2 ...