Mounting the Network Coordinator with Serial & Power Cable
1.
Use a small flat blade screw driver to pop open the top cover as shown in figure 2.0
2.
Secure the Network Coordinator in diagonal with 2 screws 6 x ½
”
.
3.
Strip back each separate conductor wire
about ¼”
and connect as shown in the
Connections for Network Coordinator details instruction.
4.
After the Network coordinator unit is secured and the conductor wires are connected
then carefully snap the top cover back on to the Network coordinator.
Figure 1.4
Connections for Network Coordinator
In order to be compliant with the UL2560 Certification the Network Coordinator needs to be
wired to the PalatiumCare Server using standard terminal blocks. The wire that connects the
server to the Network Coordinator has 4 separate conductors inside. They are colored Red,
Black, White, and Green. The 4 terminals to connect to are labeled Vs, GND, SER OUT, and SER
IN. Strip back each separate conductor wire
about 1/4”
and connect as shown below.
Figure 1.5
Содержание Palcare PAL-211401
Страница 1: ...Copyright 2018 PalatiumCare Inc Page 1 2018 Install Manual PAL 211401 FW 2 1 66 ...
Страница 10: ...Copyright 2018 PalatiumCare Inc Page 10 2018 Mounting hardware Layout WITH System Mounting Board Figure 1 0 ...
Страница 11: ...Copyright 2018 PalatiumCare Inc Page 11 2018 Mounting Hardware Layout WITHOUT system Mounting Board Figure 1 1 ...
Страница 12: ...Copyright 2018 PalatiumCare Inc Page 12 2018 PalatiumCare UL2560 System Mounting Layout Typical Figure 1 2 ...