2.
Insert the lever in the earth actuating shaft and turn
anti-clockwise.
Figure 5.90.
Lever turn detail
3.
Remove the lever.
4.
The selector returns to its original position.
5.
Check that it is de-energised.
6.
Verify that the cubicle is in isolating position.
Figure 5.91.
Isolating position detail
IG-078-EN version 12; 23/04/2020
96
Recommended sequence of operations
General Instructions
cgmcosmos
: Medium-voltage cubicles with full insulation
in SF
6
gas up to 24 kV in accordance with IEC Standard
Содержание velatia cgmcosmos
Страница 119: ......