3.
Anchor the first cubicle to the floor of the facility using
M10 bolts at the points prepared in its base. This will
prevent displacements or vibrations due to causes such
as short-circuiting, flooding, etc. The following levels
and figures should be taken into account:
Anchoring dimensions
Module
b
[mm]
c
[mm]
d
[mm]
f
Internal
arc 0.5 s
Internal
arc 1 s
-l
*
325
-
-
540
631.5
-2l
325
-
-
540
631.5
-s
/
-s-pt
410
-
-
540
631.5
-p
,
-a
430
-
-
540
631.5
-v
(AV/RAV)
430
-
-
540
631.5
-v
(AV3)
410
-
-
540
631.5
-m
730
-
-
540
631.5
-ma
525
-
-
-
-
-m-pt
730
-
-
540
631.5
-rb
/
-rb-pt
325
-
-
540
631.5
-rc
-rci
325
20
150
540
631.5
-rcd
175
540
631.5
-r2c
510
25
-
540
631.5
-2pl
*
317
-
-
540
631.5
-rpl
317
-
-
540
631.5
-3l
325
-
-
540
631.5
-2lv
293
-
-
540
631.5
* Identical values in the case of double cable
Table 4.12.
Anchoring dimensions
Figure 4.16.
Anchoring diagram
cgmcosmos
-l
,
-s
,
-p
,
-a
,
-rb
,
-2l
1300 mm high
Figure 4.17.
Anchoring diagram
cgmcosmos
-l
double cable
1300 mm high
Figure 4.18.
Anchoring diagram
cgmcosmos
-l
,
-s
,
-p
,
-a
,
-rb
,
-2l
1740 mm high
Figure 4.19.
Anchoring diagram
cgmcosmos
-l
double cable
1740 mm high
IG-078-EN version 12; 23/04/2020
33
General Instructions
cgmcosmos
: Medium-voltage cubicles with full insulation
in SF
6
gas up to 24 kV in accordance with IEC Standard
Installation
Содержание velatia cgmcosmos
Страница 119: ......