6.
Introduce the key in the metering cubicle's door
opening lock and release the door, providing access to
the inside of the cubicle.
Figure 5.109.
Metering cubicle door release
5.13.4. Commissioning operation
1.
To commission the facility, carry out the sequence
described in the section above in reverse order.
IG-078-EN version 12; 23/04/2020
105
General Instructions
cgmcosmos
: Medium-voltage cubicles with full insulation
in SF
6
gas up to 24 kV in accordance with IEC Standard
Recommended sequence of operations