![Orion OPE-11701 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/orion/ope-11701/ope-11701_user-manual_1652566034.webp)
- 64 -
- 65 -
ST
AND UNIT
SCREEN C
ONFIG'
GRAPHIC C
ONFIG'
FRAME INS
TALL'
SENSOR C
ONFIG'
OPERA
TION
W
ALL UNIT
Assemble the enclosed nut
M
6
and a washer together.
OPE-11701
Innovative e-Board of New Conception
e-Board
4
.
5
. Remove M
6
*
70
bolt for temporary attachment.
y
Remove M
6
*
70
bolt for temporary attachment at the first MAIN FRAME.
4
.
4
. Assemble the third MAIN FRAME for the lower row.
y
Hook the third MAIN FRAME at the right side of the lower row.
y
Fasten M
6
*
70
bolts with a spanner and a
5
mm allen wrench at the connection points of the second MAIN
FRAME and the third MAIN FRAME.
y
Use a spanner and a
5
mm allen wrench to fasten M
6
*
45
bolt at the lower Wall Bracket from the bottom side.
y
Be cautious not to fall MAIN FRAME during assembly work.
M
6
*
70
M
6
*
45
M
6
*
70
Put the contacting
surfaces in accurate
position and fasten
them with the enclosed
5
mm Allen Wrench and
the spanner.
second MAIN FRAME
third MAIN FRAME
Make sure the surfaces of the second
MAIN FRAME and the third MAIN FRAME is
accurately contact with each other. Or, the
gap between the MPDP sets may be wider.