7-4 Requesting a Replacement PT
7-14
7-4 Requesting a Replacement PT
Always observe the following precautions when faults are detected during inspection and the
PT is to be replaced.
•
Create a backup of the PT project data.
Project data may be deleted when the PT is repaired by OMRON.
•
Always turn OFF the power before replacing the PT.
•
After replacing the PT, check to confirm that the new PT has no faults.
•
When returning a faulty PT for repair, include a document with the Unit that provides as
many details on the fault as possible, and send to your OMRON representative.
Содержание NS15-V2 Series
Страница 1: ...Cat No V083 E1 14 Programmable Terminals NS Series SETUP MANUAL...
Страница 2: ......
Страница 34: ...1 4 Procedure for Running NS series PTs 1 12...
Страница 54: ...2 2 Part Names and Functions 2 20...
Страница 144: ...4 4 Recommended Connector Cables 4 28...
Страница 174: ...5 3 Connecting to Host via EtherNet IP 5 30...
Страница 196: ...6 3 PT Settings 6 22 PT Tab Page for the NS10 and NS8 Page 1 Page 2 Page 3 Page 4 PT Tab Page for the NS5 Page 1 Page 2...
Страница 246: ...6 11 Verifying Tags 6 72...
Страница 280: ...Appendix 2 Dimensions A 20 NS5 V1 V2 Cable Connection Dimensions...
Страница 333: ......
Страница 334: ......