6-3 PT Settings
6-31
If
ON
is selected, a message to confirm whether to start the Ladder Monitor will be displayed
when an alarm or event is selected in the Alarm/Event Summary and History.
1. Select either ON or OFF for starting Ladder Monitor from alarm/event summary and his-
tory.
2. After completing the setting, press the
Write
Button. The setting will be saved.
Reference
•
Refer to the
NS-series PT Programming Manual
for information on the alarm/event
summary and history.
•
With Ladder Monitor version 3.0 or higher, the system will automatically search for the
communications address of the selected alarm or event when the Ladder Monitor
starts.
6-3-15 Setting the Tag Update Notification Message
If tags are used by projects in the NS-series PT, tags will be automatically verified when lad-
der data is downloaded to the host. Set whether to display a confirmation message before
the system starts to verify the tags.
Make the setting on the PT Operation Tab Page in the System Menu.
1.
Select
either
Display
or
Hide
for the tag update notification message setting.
Reference
•
Refer to
6-11 Verifying Tags
for information on verifying tags.
•
Tags can be used when connection is made to a CJ2H-CPU
@@
-EIP PLC using
EtherNet/IP.
6-3-16 Time to Switch to System Menu (NS12, NS10, NS8, or NS5)
With a NS12, NS10, NS8, or NS5 PT, the time required to switch to the System Menu when
two of the four screen corners are pressed can be set. A longer time can be set to help pre-
vent unintentional access to the System Menu.
The time to switch to the System Menu can be set to between 0 and 5 s.
Set the time using the following procedure from the PT Settings Tab Page in the System
Menu:
1. Set the time in seconds in the Time to keep pressing 2 corners on the screen [sec] for
Entering System Menu Field. Press the field and enter the time from the dialog box that
is displayed.
2. After setting, press the Write Button to save the setting.
Содержание NS15-V2 Series
Страница 1: ...Cat No V083 E1 14 Programmable Terminals NS Series SETUP MANUAL...
Страница 2: ......
Страница 34: ...1 4 Procedure for Running NS series PTs 1 12...
Страница 54: ...2 2 Part Names and Functions 2 20...
Страница 144: ...4 4 Recommended Connector Cables 4 28...
Страница 174: ...5 3 Connecting to Host via EtherNet IP 5 30...
Страница 196: ...6 3 PT Settings 6 22 PT Tab Page for the NS10 and NS8 Page 1 Page 2 Page 3 Page 4 PT Tab Page for the NS5 Page 1 Page 2...
Страница 246: ...6 11 Verifying Tags 6 72...
Страница 280: ...Appendix 2 Dimensions A 20 NS5 V1 V2 Cable Connection Dimensions...
Страница 333: ......
Страница 334: ......